July 2021

Cannock Chase Enterprise Centre Installation

Featured Products

AHS Renewables Ltd have installed two Modutherm boilers at Cannock Chase Enterprise Centre.

‍

The Cannock Chase Enterprise Centre offers flexible office space on the site of the ex colliery, and is the original enterprise centre first set up to assist small businesses.

‍

The boiler house is a packaged plant room housing a 200kW biomass boiler. Modutherm has supplied its Genesis WM 120 stainless steel condensing boiler, from its range of wall mounted boilers with outputs ranging from 45-150kW, paired with a cascade pipework kit. The WM boiler comes with a 5 year heat exchanger warranty, and a 2 year parts warranty.

‍

The boilers are paired with 2 Buffer Vessels, which store up to 2500 litres.

‍

The Genesis WM boiler has a high modulation range of up to 10:1, and has compact dimensions.

‍

For more information, contact us on 0345 521 5666 or modutherm@modularhg.co.uk.