Modutherm supplied the heat pump and hot water solution for the Operations Centre of the Mercedes-AMG PETRONAS Formula One Team in Brackley, Northamptonshire. The installation was completed by Caddick Construction.
The Mercedes-AMG PETRONAS F1 Team Operations Centre in Brackley is one of the most advanced motorsport facilities in the world. Home to over 950 employees working around the clock, the site is where Mercedes-AMG F1 cars are designed, engineered, and constructed. The campus covers a total area of 126,000m² and operates 24 hours a day, seven days a week throughout the Formula One season.
Sustainability is central to the facility's operations. The Brackley site:
The team is currently undertaking a £70 million transformation of the campus into a sustainable parkland campus, with sustainability, health, and wellbeing at the heart of the development.
A facility operating 24 hours a day, seven days a week demands heating and hot water systems that match its exacting standards for reliability, efficiency, and environmental performance. With ISO 14001 certification and the FIA's Three Star Environmental Accreditation to maintain, any new plant installation needed to demonstrably support the site's net zero ambitions whilst delivering consistent performance for a large, continuously occupied workforce.
The commissioned AW290 installation delivers reliable, low-carbon heating and hot water for one of Formula One's most demanding operational environments. The system's natural refrigerant, high efficiency, and low direct emissions align directly with the Mercedes-AMG F1 Team's environmental accreditations and net zero ambitions—demonstrating that the performance standards required at the highest level of motorsport and the sustainability standards required for responsible operations are not mutually exclusive.